Zhezkazgan CHPP Kazakhmys Energy LLP (Kazakhmys Energy) Installed electrical capacity - 252 MW Available electrical capacity - 252 MW ICUF - 75.2% Installed thermal capacity - 564 Gcal / hour Available thermal capacity - 564 Gcal / hour ICUM - 30.5 % Balkhash CHPP Kazakhmys Energy LLP (Kazakhmys Energy) Installed electrical capacity - 145 MW Available electrical capacity - 145 MW ICUF - 86.4% Installed heat capacity - 383.6 Gcal / hour Available heat capacity - 383.6 Gcal / hour ICUF - 26.9%